﻿BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.29.0//EN
X-ORIGINAL-URL:https://iibec.org/
X-WR-CALNAME:IIBEC
X-WR-CALDESC:IIBEC is an international association of building envelope consultants. Members specialize in design, investigation, repair, and management of roofing, exterior wall, and waterproofing systems.
X-WR-TIMEZONE:America/New_York
BEGIN:VTIMEZONE
TZID:America/New_York
X-LIC-LOCATION:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T030000
RRULE:FREQ=YEARLY;BYMONTH=03;BYDAY=2SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T010000
RRULE:FREQ=YEARLY;BYMONTH=11;BYDAY=1SU
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-61501c1f651da2774f8bb6bbec365d84@iibec.org
DTSTART;TZID=America/New_York:20200612T100000
DTEND;TZID=America/New_York:20200612T111500
DTSTAMP:20200609T113355Z
CREATED:20200609
LAST-MODIFIED:20200610
PRIORITY:5
SEQUENCE:0
TRANSP:OPAQUE
SUMMARY:Look Out Below – A Curtainwall Case Study
DESCRIPTION:Presented by Jacqueline Byndas Prakhov and Jason Siwek, PE, both of Walter Moore Associates\nCurtainwall systems have been used in commercial construction since the 1970s. Though the performance of these systems has improved, there is still much to learn about how design choices affect service life resilience. This presentation will discuss the fundamentals of commercial fenestration system types, performance, and proper detailing followed by a case study illustrating how these concepts were applied. The case study of Clements University Hospital, a fully operational 12-story healthcare facility, illustrates how typical detailing of newly incorporated elements could have adverse long-term effects.\nBeauty caps on a typical captured glass curtainwall system were falling and posed a life safety risk to the public. Walter P Moore was engaged to perform a peer review of the construction documents to identify possible causes of failure, as well as a visual survey to identify additional falling hazards. The Challenging Access Team mobilized to conduct the visual assessment of the tower curtainwall system by rope access. By implementing quality control processes for the repairs, performing hands-on observations, and examining the installed repairs, repair solutions would mitigate future falling hazards, as well as reduce risks for the owner and building patrons. These and other challenges encountered throughout assessment, design, and construction oversight will be discussed.\n
URL:https://iibec.org/iibec-events/look-out-below/
CATEGORIES:Convention
LOCATION:Virtual Convention
END:VEVENT