﻿BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.29.0//EN
X-ORIGINAL-URL:https://iibec.org/
X-WR-CALNAME:IIBEC
X-WR-CALDESC:IIBEC is an international association of building envelope consultants. Members specialize in design, investigation, repair, and management of roofing, exterior wall, and waterproofing systems.
X-WR-TIMEZONE:America/New_York
BEGIN:VTIMEZONE
TZID:America/New_York
X-LIC-LOCATION:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T030000
RRULE:FREQ=YEARLY;BYMONTH=03;BYDAY=2SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T010000
RRULE:FREQ=YEARLY;BYMONTH=11;BYDAY=1SU
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-a043e8d539356a54a784943d765f2b3a@iibec.org
DTSTART;TZID=America/New_York:20200614T100000
DTEND;TZID=America/New_York:20200614T111500
DTSTAMP:20200609T183617Z
CREATED:20200609
LAST-MODIFIED:20200610
PRIORITY:5
SEQUENCE:0
TRANSP:OPAQUE
SUMMARY:Legal Import of Inconsistent Design Specifications and Manufacturer Warranties
DESCRIPTION:Presented by Joshua D. Baker and Brian T. Must, both of Metz Lewis Brodman Must O’Keefe, LLC\nVarious issues can arise when design specifications are inconsistent with or contradict warranty requirements on a typical design-bid-build (DBB) project. In the typical DBB project, there are contractual rights and obligations created between the owner and the architect and the owner and the contractor, but not between the architect and the contractor. This dynamic can often lead to situations where the design specifications actually void the manufacturer’s warranty.\nThis presentation will focus on three primary topics: 1) the delivery of warranty-compliant design specifications, 2) the legal rights and recourses available to owners, designers, specifiers, and manufacturers when the specifications are inconsistent with the warranty requirements, and 3) what courts have ruled when faced with situations involving inconsistent design specifications and warranty requirements.\nHow the legal system has treated ambiguous and/or uncertain terms between the project specifications and the warranties provided will be discussed. The potential impacts of unclear contract documents, including greater liability exposure and financial risk, will be presented. Best practices to avoid the potential consequences of voiding a manufacturer warranty will also be provided.\n
URL:https://iibec.org/iibec-events/legal-import-warranties/
CATEGORIES:Convention
LOCATION:Virtual Convention
END:VEVENT
END:VCALENDAR
