BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.29.0//EN
X-ORIGINAL-URL:https://iibec.org/
X-WR-CALNAME:IIBEC
X-WR-CALDESC:IIBEC is an international association of building envelope consultants. Members specialize in design, investigation, repair, and management of roofing, exterior wall, and waterproofing systems.
X-WR-TIMEZONE:America/New_York
BEGIN:VTIMEZONE
TZID:America/New_York
X-LIC-LOCATION:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T030000
RRULE:FREQ=YEARLY;BYMONTH=03;BYDAY=2SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T010000
RRULE:FREQ=YEARLY;BYMONTH=11;BYDAY=1SU
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-89af2d733e72863425e315cb50538173@iibec.org
DTSTART;TZID=America/New_York:20200614T144500
DTEND;TZID=America/New_York:20200614T160000
DTSTAMP:20200610T102208Z
CREATED:20200610
LAST-MODIFIED:20200610
PRIORITY:5
SEQUENCE:0
TRANSP:OPAQUE
SUMMARY:Façade Access and Fall Protection – Designed Systems or Afterthought?
DESCRIPTION:Presented by Kimani Augustine, PE, and Jeffrey Kobes, both of Walter P Moore & Associates, Inc.\nThe rules and regulations governing safety requirements for workers exposed to occupational hazards associated with walking-working surfaces are often misunderstood by building owners, design consultants, employers, employees, and third-party contractors. Owners are not always clear what is required, and traditional design consultants are often not comfortable specifying these systems. Due to this issue, façade access and fall protection systems frequently become an afterthought instead of being included in pre-design discussions and considerations.\nThis presentation will discuss the regulations and industry best practices associated with façade access and fall protection systems. It will also address the role of the design consultant in specifying these systems and recommended methods to streamline coordination challenges among the parties.\nA façade access case study for the Las Vegas Convention Center project will be presented to demonstrate the benefit of early coordination. With 120-foot-tall curtainwalls at the 220-foot-wide porte cochere, 60-foot-tall curtainwalls along the remainder of the 600-foot-long building front, and a continuous undulating ribbon overhang that extends 8 to 12 feet from the exterior face of the building, designing systems for routine façade access and maintenance of the center was a challenge. The case study will highlight the successful processes used by the design and construction team to produce safe, efficient, and OSHA-compliant access at elevated building areas.\n
URL:https://iibec.org/iibec-events/facade-access-fall-protection/
CATEGORIES:Convention
LOCATION:Virtual Convention
END:VEVENT
END:VCALENDAR
