In many ways, ceramic-tiled shower walls can be investigated and evaluated in the same manner as clad exterior walls. Both rainwater and plumbed interior water have the same potential to promote decay, deterioration, and fungal growth via unintended breaches in a wall’s water-protective envelope. In all cases, the most severe levels of internal damage generally will be encountered within those wall systems that have been most exposed to water leakage at breaches and voids. Conversely, the less water that flows across such deficiencies, the greater the likelihood that any internal damage will be minor. Further, at all water-exposed walls, deficient transitions at changes in plane and changes in material tend to be the most common locations of moisture infiltration.1
This article demonstrates how industry standard guidelines for the investigation and evaluation of water leakage at exterior walls similarly could be used to appraise leakage behavior properties and associated internal damage within ceramic-tiled shower walls at a residential condominium complex in San Francisco.
ASTM Standard E2128 (Standard Guide for Water Leakage of Building Walls)2 describes recommended methods for determining and evaluating causes of water leakage of exterior walls: “This guide does not address leakage through roofs, leakage below grade, or water that accumulates due to water vapor migration and condensation. It is not intended for use with structures designed to retain water, such as pools and fountains.”3
E2128’s authors report: “The evaluation of water leakage…is a cognitive process in which technically valid conclusions are reached by the application of knowledge, experience, and a rational methodology to determine the…applicability of findings to similar uninspected or untested locations on the building.”4
Despite this standard’s narrow focus on the evaluation of leakage at exterior walls, its basic sampling guidelines certainly can be used to evaluate water leakage behavior properties of comparable building envelope systems—such as roofing membranes and deck/balcony waterproofing—intended to resist rainwater intrusion. In similar fashion, as reviewed below, a cognitive evaluation of the project-wide water-resistive performance of tile-clad shower walls also can be carried out in general accordance with the evaluative strategy of ASTM E2128.
Consider a three-building, three-story, wood-framed residential condominium complex constructed circa 2005 in a continuous manner by the same developer, general contractor, and subcontractors. During our investigation of reported cladding and waterproofing failures, homeowners at all three buildings also reported interior leakage that appeared to originate from their neighbors’ bathrooms. Within the 176 dwelling units were 304 shower and tub-shower spaces with ceramic-tiled walls (Figure 1). These tiles were adhered with a thinset bond coat to a cement board underlayment (CBU) installed atop gypsum wallboard (Figure 2).
At all inspected locations, the installer terminated these CBU panels directly at (or as much as ¼ inch above) the vertical flanges (Figure 3) that project upward from the fiberglass shower pans and tub units. In contrast with these as-built conditions, industry standard methods B412 and B415, published by the Tile Council of America (TCA),5 show the CBU panel overlapping the vertical flange in a water-shedding manner similar to that seen at exterior lap siding and shingles.
Further, the TCA details prescribe placement of a protective “membrane” (also overlapping the vertical flange) behind the CBU. This asphaltic or polyolefin sheeting provides secondary protection against incidental water leakage through the grouted ceramic-tiled wall assembly, which acts as a “face-sealed” primary barrier.
Regarding the weather-resistive design and performance characteristics of exterior walls, ASTM E2128 advises: “The ‘first line of defense’ against water penetration is the exterior exposed surfaces of the wall system. In order for leakage to occur, water must first penetrate the outer surfaces. The ability of a wall to resist leakage may or may not be totally dependent on the ‘first line of defense.'”6
The authors of ASTM E2128 then describe several basic types of water-resistive walls, including “face-sealed” barrier walls: “The exterior surfaces are relied upon as the only barrier. All joints and interfaces must be sealed to provide a continuous exterior barrier, and the absorption properties of the materials must also be controlled. The materials within the wall assembly must be able to sustain occasional short-term wetting as might occur between maintenance cycles of the exterior seals or from unintended incidental water infiltration. The system can also incorporate a secondary water-resistant system in selected areas where incidental infiltration is anticipated.”7 [Italic emphasis added.]
In our assessment, the ceramic-tiled shower walls prescribed by TCA methods B412 and B415 are intended to function in the very same manner as exterior face-sealed barriers with a secondary leakage protection layer, as described by ASTM E2128.
The authors of ASTM E2128 emphasize the importance during the early diagnostic phase of an investigation of researching the history of a project’s water leakage problems: “Gathering information on the service history related to leakage problems serves several purposes. First, patterns in the observed leakage and visible damage can provide an indication of the cause(s) and where to focus an investigation. Second, and more importantly, the information provides a checklist against which failure theories and conclusions can be evaluated. A comprehensive diagnostic program should result in an explanation for most if not all aspects of the observed leaks and damage.”8
After our initial visual surveys and preliminary testing, we concluded that the most likely source of the water damage seen in multiple bathrooms was leakage at loose shower tiles and those that exhibited deteriorated and missing grout (Figures 4 and 5). Due to the tile installer’s failure to install the secondary protective membrane recommended by TCA, this water leakage then migrated through the poorly grouted, non-lapped CBU-to-flange transitions into the wood-framed walls.
One member (Orozco) of our investigative team had extensive past experience operating his own tile installation company before concluding that diagnosing large-scale building envelope performance failures would provide a far more challenging and rewarding career.
Upon closer evaluation of the many partially detached tiles already observed, Orozco determined the installers commonly had set these ceramic tiles into a thinset bond coat that already had “skinned over” (i.e., the bond coating already had begun to cure and no longer was sticky), contrary to controlling industry standards.
Further, Orozco reported that the many grout failures observed at all three buildings were indicative of poor quality control and inconsistent workmanship, including: 1) failures to properly “pack” the grout into the joints, 2) improperly mixed grout, and/or 3) grout packed after cement hydration had started.9
It has been our firm’s experience that generally similar construction practices (whether of good, middling, or poor quality) often will be found throughout large-scale residential projects initiated and completed by the same developer and general contractor from beginning to end. For example, at any particular project, the windows likely will be flashed in a similar manner, deck waterproofing membranes will be terminated at the perimeter edge metal in generally the same fashion, and cladding and siding systems will tend to be consistently installed.
In short, it is our experience that good workmanship commonly will spread through a construction project. Likewise, poor and middling quality control generally proves contagious. (The phrase “general consistency of construction” was used in a prior RCI Interface article10 to describe such expectations for the “portable production line”11 processes that are typical for large-scale residential projects driven by tight financial pressures.)
The authors of ASTM E2128 use the phrase “intrinsic” at Section 4.1.4 to describe a comparable concept that reliably consistent design and workmanship can be expected, in general, at many buildings: “The methodology in this guide is intended to address intrinsic leakage behavior properties of a wall system, leading to conclusions that generally apply to similar locations on the building.”
Upon completion of our initial assessment phase of these ceramic-tiled shower walls, two generally consistent deficiencies had been identified, per Figure 3: 1) poorly grouted and non-lapped CBU-to-flange transitions, and 2) the absence of the TCA-required (and architect-specified) protective sheet membrane behind the CBU panels. Further, issues of poor quality control (improperly packed grout and the practice of setting the ceramic tiles to skinned-over mortar) by the installer appeared likely to be intrinsic to the complex.
Additionally, while some of these showers (at guest bedrooms, for example) were seldom used and others most likely had been occupied at least several times a day ever since these buildings had first been occupied, the actual durations, spray patterns, or flow rates of past showering processes at the project’s 304 shower and tub-shower spaces certainly could not be quantified.
Therefore, the varying nature and extent of any internal water damage within these failed tiled wall assemblies resulting from the complex multiyear interplay between intrinsic construction defects, poor quality control, and widely inconstant historical shower usage patterns—certainly could not be readily quantified.
Even if the distribution of any particular defect is consistent within a cladding system, this does not mean the nature, extent, and/or severity of resulting internal water damage similarly will be consistent. In our experience, widely disparate levels of leakage and associated deterioration can ensue from even minute exposure variables at comparable deficiencies in a wall’s primary water-resistive barrier.
This perspective is confirmed by the authors of ASTM E2128: “It is not assumed or expected that all locations with similar design, construction, and service characteristics will be currently performing in precisely the same manner. Likewise, it is not necessary to establish such in order to reach technically valid conclusions about why and how a building leaks.”12 To better diagnose and project the range of resulting internal damage (from none to severe) occurring behind the intrinsically deficient tile cladding, supplemental surveys and destructive testing were targeted at shower enclosures that were expected (based on the presence or absence of external clues) to be “rich”13 with comparative data.
As an example, the shower enclosure in Figure 6 had been selected for sampling because it did not exhibit obvious external clues and evidence of hidden damage. In a manner that is fully consistent with the above-cited guidelines of ASTM E2128, the team’s “cognitive” assessment process at this shower was purposeful and targeted, not the blind random sampling beloved by traditional statisticians.
Similarly, as documented at Figure 7, team members removed intrinsically loose tiles at a shower wall where they expected (based upon external evidence) to expose severe damage and decay due to water infiltration through the failed grout joints. As evidenced by Figure 8, the mislapped CBU-to-flange transition was also exacerbated by the absence of the TCA-required protective membrane layer behind the CBU.
Per Figure 9, it was confirmed that leakage through the mislapped (and poorly grouted) CBU-to-flange transition can “wick” upward (via capillary action) at the back side of the CBU panel, promoting deterioration and fungal growth at the unprotected gypsum wallboard.
Additional removal of loose tiles at this shower confirmed (per Figure 10) that the internal water damage within these walls was not limited to just their base-wall transitions to the fiberglass shower pan. Further, removal of this pan exposed a fully destroyed subfloor assembly (Figure 11).
Even then, it was only after exposing the dramatic damage conditions depicted in Figures 12 and 13 (showing the underside of the same failed subfloor) and Figure 14 (revealing severe multi-floor decay and structural impairment within this shaft enclosure) that the remarkable extent of the damage resulting from the intrinsic waterproofing deficiencies at this single ceramic-tiled shower enclosure could be fully delineated.
Clearly, any repair plan for the shower and tub-shower enclosures had to account for project-wide (intrinsic) defects at the primary water-resistive barrier (the face-sealed ceramic tiles) and also associated internal water damage, ranging from minimal to severe (as exacerbated by occupants’ shower usage variables), within these wood-framed wall assemblies.
Upon close review and further qualitative analysis, including visual (nondestructive) evaluation of 222 of the 304 ceramic-tiled enclosures, the team concluded that the necessary repairs could be projected and budgeted in accordance with a three-part plan:
These estimated scope-of-repair percentages were qualitative and purposeful (non-random) in nature, in a manner consistent with ASTM E2128’s evaluative guidelines: “The protocol in this guide is not based on conventional hypothesis testing and quantitative random sampling. The starting premise for the application of this guide is that the building is suspected or known to leak. The objective of this guide is qualitative, purposeful, and intended to address the question of why, how and to what extent a building leaks.”14 [Italic emphasis added.]
Additionally, at Sections 11.2 to 11.5, the authors of ASTM E2128 provide the following perceptive guidance:
A primary goal of our team’s assessment strategy had been the tying together of causes and effects. The primary leakage pathways at these shower enclosures had been identified; the range of potential consequences of such leakage had been established; and the severity, consistency, and distribution of these consequences credibly had been estimated. Our many digital photographs and related notes and records had been compiled and maintained in such a manner than any party skilled in leakage evaluation could duplicate the assessment process. In short, the investigation and evaluation had been both inductive15 and deductive16 in nature and had been carried out with methodological competence, intellectual rigor, and professional integrity.
The consultant representing the contractor who had erected these face-sealed enclosures similarly had carried out his own qualitative assessment of the alleged deficiencies and resulting damage. This defense evaluation process did not include any additional testing or tile removals.17 He reported that the as-built CBU-to-flange transitions and the absence of an underlying protective membrane represented the unwritten local “industry standard” for tile contractors, even at projects where the architect had specified compliance with TCA methods and details.
In response, we advised our plaintiff clients that industry standards are not simply the unwritten customary practices of a local group of contractors. Just because everyone within a trade reportedly does or does not carry out any particular activity, this is not evidence of a consensus industry standard. In short, poor-quality work cannot be defended by arguing that this level of craftsmanship is customary for a specific group of contractors who specialize in being the low bidder at large-scale multifamily residential projects.18
Soon thereafter, the attorneys for the tile contractor’s insurance carrier raised a new objection. Because none of these analyses by either the plaintiff or defense consultants had been founded on random statistical sampling, all of them should be excluded from the litigation process. In short, at trial, the judge would be asked to issue a ruling that expert evaluation processes for construction defects claims in California should strictly adhere to the tenets of random statistical analysis.
In our experience, this defense approach—asking the judge (via a ‘motion in limine’19) to issue a ruling that statistical sampling is the only acceptable technique for expert evaluation of alleged water-resistive performance failures at large-scale residential complexes—is increasingly common when the plaintiffs’ case is strong and well documented.20
Further, when the trial eventually commenced, the judge also would be asked to rule that ASTM E2128’s evaluative guidelines, as discussed and documented above, could be applied (at most) only to investigations at exterior walls, not the failed ceramic-tiled shower enclosures at this residential complex. In response to these various motions, we were prepared to inform the judge that:
Overall, we were fully confident that the judge and jury would accept the honesty, integrity, and professionalism of our qualitative analyses of all plausible rival hypotheses to explain the nature, extent, severity, and necessary repairs of the intrinsic defects and resulting damage (both documented and projected) at these tile-clad shower enclosures.
However, months later, as we still continued to prepare for trial, we suddenly were advised that all parties had agreed to settle this matter. While the settlement terms remained confidential, we noted that our clients’ attorney appeared to be extremely satisfied with the results of the litigative process.
Lonnie Haughton, MCP, LEED AP, CDT is a principal codes consultant with Richard Avelar & Associates in Oakland, CA. Haughton is a licensed general contractor and one of about 800 individuals nationwide who are certified by the International Code Council as active Master Code Professionals. His additional ICC certifications include California Building Inspector, Building Plans Examiner, Fire Inspector I, and Certified Building Code Official. Haughton’s two-part history of San Francisco’s Building Laws and Codes can be downloaded at: www.RAvelar.com/company/articles.html.
David M. Field, AIA, NCARB, a principal architect with RA&A, received his BA in architecture from the University of California at Berkeley and his master’s in architecture from the University of Colorado at Denver. Field joined RA&A in 2000, obtained his architect’s license in 2004, and advanced to the management team in 2012. His areas of active architectural and expert witness practice include forensic analysis, building performance and code compliance review, design and repair specifications, and contract administration.
Jared Orozco joined the RA&A team as a construction consultant in 2009. He received his BS in construction management from California State University at Chico. Orozco is a licensed general contractor and a C 54 Tile and Mosaic Specialty Contractor. His additional certifications include Ceramic Tile Specialist, issued by the Ceramic Tile Institute of America.