In October 2020, Factory Mutual (FM) published a revised scope for FM Global Property Loss Prevention Data Sheet 1- 52, Field Verification of Roof Wind Uplift Resistance. The scope was changed to replace the statement of allowed use in cases “where inferior construction is suspected (or known to be present) or where a partial blow-off has occurred.” The substituted statement reads: “This field test has no applicability to the evaluation of whether roof assemblies have experienced wind uplift damage subsequent to a storm event.” This revised scope eliminates use of the uplift test on existing roofing after a known or suspected storm event. The IIBEC codes and standards committee (CSC) and the technical advisory committee (TAC) are examining the best approach to assist IIBEC members with this change. For more information, please contact IIBEC Senior Director of Technical Services Emily Lorenz at elorenz@iibec.org.
Summer school starts with IIBEC education—at 40% off for members!Now through July 7, save big on the top on-demand courses you can watch anytime, anywhere. Learn on your schedule and boost your skills before summer’s over.
Just enter code SUMMER26MEM at checkout to save 40%! Nonmembers save 25% by entering code SUMMER26NONMEM. Build your knowledge and expertise this summer with the industry’s best education!
Earn IIBEC CEHs All Summer