Preventing Failures in Hot Fluid-Applied Rubberized-Asphalt Membranes

May 15, 2011

PREVENTING FAILURES IN HOT FLUID-APPLIED
RUBBERIZED-ASPHALT MEMBRANES
ANTHONY J. NICASTRO, PE; AND CHRISTINA T. PARKER
SIMPSON GUMPERTZ & HEGER INC.
2101 Gaither Rd., Park Plaza I, Suite 250, Rockville, MD 20850
Phone: 301-417-0999 • Fax: 301-417-9825 • E-mail: ajnicastro@sgh.com
S Y M P O S I U M O N B U I L D I N G E N V E L O P E T E C H N O L O G Y • OC T O B E R 2 0 1 1 NI C A S T R O • 2 3
ABSTRACT
Hot fluid-applied rubberized-asphalt waterproofing membranes have a long track record
of performance in plaza waterproofing such as podium decks and vegetative roofs. These
membranes have become a popular choice for waterproofing systems as designers strive to
incorporate occupant-accessible rooftop plazas and vegetative/green roofs into their projects.
Recently, however, the roofing industry has observed a number of issues with the
application of the hot fluid-applied rubberized-asphalt membrane, including widespread
delamination, pinholing, and blistering. In the past, these issues were primarily attributed
to moisture in the concrete slab. Using quantitative tools to measure moisture content in
concrete slabs, we have determined that some failures can also be attributed to factors
including primer application, material application, membrane temperature, and others. We
have found that successful application is highly dependent on a combination of issues such
as the age and moisture content of the concrete substrate, proper primer application and
drying time, well-timed application of the membrane, and a project-by-project series of
adhesion tests.
Utilizing the authors’ experiences during recent projects, this paper will discuss modes
of failure in fluid-applied rubberized-asphalt membranes and present successful solutions,
including modifications during the design phase, in-field mock-up testing, and other quality
control measures.
SPEAKER
ANTHONY J. NICASTRO, PE — SIMPSON GUMPERTZ & HEGER INC., ROCKVILLE, MD
ANTHONY J. NICASTRO, PE, is a senior engineer at national engineering firm Simpson
Gumpertz & Heger Inc. (SGH). His work addresses issues related to the integrity and performance
of building enclosure systems on a range of structures, including residential, commercial,
institutional, and high-rise buildings. He has consulted with architects, contractors,
and building owners to analyze design concepts, evaluate construction defects, and
develop repairs for water intrusion issues. He works in SGH’s Washington, DC, office.
2 4 • NI C A S T R O S Y M P O S I U M O N B U I L D I N G E N V E L O P E T E C H N O L O G Y • OC T O B E R 2 0 1 1
INTRODUCTION
This paper presents case studies of failures
in the application of hot fluid-applied
rubberized asphalt in new construction, discusses
possible causes of failure, and discusses
how the design and construction
teams on each project overcame the challenges
they encountered. The authors will
demonstrate that a combination of thorough
field observation, construction of mock-ups,
and application of available ASTM testing
methods to determine acceptability of the
substrate will provide the best chance at
successful application of hot fluid-applied
rubberized-asphalt membranes.
A BRIEF HISTORY
Hot fluid-applied rubberized-asphalt
membranes have been used in the roofing
and waterproofing industries for decades.
Their failure is not a new phenomenon in
the waterproofing industry but is uncommon
when compared to the failure rates of
other waterproofing membranes. The industry
has adjusted the membrane over time to
accommodate failures observed in the overall
system. Excess moisture vapor in concrete
substrates can adversely affect fluidapplied
waterproofing membranes due to
their initial application, and this phenomenon
has influenced the evolution of hot
fluid-applied rubberized asphalt.
Initially, hot fluid-applied rubberizedasphalt
roofing was commonly installed in a
single, 180-mil layer over concrete decks. A
slew of failures in the mid-
1980s–particularly on projects that utilized
lightweight structural concrete as a substrate–
led manufacturers to reevaluate their
assembly. Lightweight concrete typically
requires a longer drying time in comparison
with normal-weight concrete, due to the
increased absorption properties of the lightweight
aggregates. At the projects that experienced
failures during installation, the
applicators observed extensive pinholing
after application of the single layer of hot
fluid-applied rubberized asphalt. The pinholing
was caused when moisture in the
concrete deck vaporized and moved to the
exterior through the freshly installed hot
fluid-applied rubberized-asphalt membrane.
The industry responded to the failures
with the addition of a reinforcing layer and
a second coat of membrane. After the
1980s, an increasing number of hot fluidapplied
rubberized-asphalt systems consisted
of a 215-mil-thick coating with fabric
reinforcing, in part to compensate for the
high moisture condition in lightweight concrete
substrates. Revised specifications for
the 215-mil system included a two-part
installation. The first 90-mil-thick layer of
hot rubberized asphalt and fabric allows for
and isolates the expected pinholing effect.
The subsequent application of a 125-mil
layer fuses with the initial layer, consolidating
to form the complete assembly.
MODES OF FAILURE
The addition of reinforcement into the
hot fluid-applied rubberized-asphalt system
to overcome the pinholing enhanced the
overall system and reliability as a waterproofing
membrane. However, despite the
evolution of hot fluid-applied rubberized
asphalt into a thicker reinforced system, the
industry still observes failures, including
delamination and pinholing. These modes
of failure are described in greater detail
below.
Failure to Initially Adhere to Substrate
Low-permeability roofing systems (i.e.,
hot fluid-applied rubberized asphalt) can
blister or delaminate at the concrete deck
substrate due to a vapor drive toward the
roofing or waterproofing assembly, improper
surface preparation, or other sources.
Delamination can occur when the internal
pressure exerted by a water vapor or solvent
vapor (result of primer application) exceeds
the bond forces between the membrane and
the substrate. The membrane can also fail
to initially bond to the substrate, causing
delamination if the substrate is too smooth
or includes a bond inhibitor (i.e., concrete
additive or curing compound; see additional
discussion below). When heated by the
sun, hot fluid-applied rubberized asphalt
can become soft and pliable. If the membrane
is not fully adhered, it will delaminate
from the substrate. Upon cooling, the blistered
or delaminated area remains plastically
deformed and, on reheating, can
expand further. If left uncorrected, the
delamination can lead to building leakage.
Pinholing
When the vapor drive through the membrane
is strong enough, during initial application
of the membrane, fluid-applied
waterproofing membranes develop small
discontinuities that resemble pinholes prior
to curing. The areas of discontinuity are
gaps in the membrane and are often circular
in shape. The gaps then become potential
water-entry locations after the membrane
sets. Hot fluid-applied rubberized
asphalt also develops pinholes due to
excess moisture within the concrete substrate
as it vaporizes and drives through the
uncured membrane. As discussed above,
the industry addressed this issue with the
addition of reinforcement and a second
layer of membrane.
Interlayer Adhesive Failure
Some blisters in the membrane can
form between the reinforcing sheet and the
second layer of hot-applied asphalt membrane.
These blisters can form if an
unknown substance or moisture is present
on the surface of the reinforcing sheet at the
time of application. Blisters will also form
between the layers if the hot-applied
asphalt system (without a protection layer)
is exposed to direct sunlight for longer than
48 hours.
TESTS AND PRACTICES TO
PREVENT FAILURE
Our experience shows that successful
application of hot-applied rubberized
asphalt is highly dependent on the age and
moisture content of the concrete substrate,
well-timed application of the membrane,
and a project-specific series of adhesion
tests to determine proper primer coverage.
PREVENTING FAILURES IN HOT FLUID-APPLIED
RUBBERIZED-ASPHALT MEMBRANES
S Y M P O S I U M O N B U I L D I N G E N V E L O P E T E C H N O L O G Y • OC T O B E R 2 0 1 1 NI C A S T R O • 2 5
Moisture in Concrete
Manufacturers of hot fluid-applied rubberized
asphalt typically recommend applying
the membrane to a substrate that is
clean, dry, and free of water, ice, snow,
dust, curing compound, or any foreign matter.
Concrete should be allowed to cure for
14 days minimum (21 for lightweight concrete).
Cure time is essential to allow water
to dissipate from the concrete. Several test
methods are available to address moisture
in concrete decks prior to the application of
a hot fluid-applied rubberized-asphalt
membrane. Each test method described
below measures moisture content of the
concrete substrate. If used properly, these
tests can indicate whether a concrete deck
is too moist to support the application of a
hot fluid-applied asphalt system.
• ASTM D4263 – Standard Test
Method for Indicating Moisture in
Concrete by the Plastic Sheet
Method. This test consists of sealing
a piece of plastic sheeting (approximately
18 in by 18 in) to the concrete
surface (Figure 1). After
approximately 16 hours, the sheet is
removed, and both the sheet and
concrete surface are inspected.
Moisture on either the plastic or
concrete surface indicates wet concrete,
which requires additional drying
time prior to installation of a hot
fluid-applied rubberized-asphalt
membrane. ASTM D4263 requires
testing of one area per 500 sq ft
maximum. This test has several limitations:
the exterior environment
(i.e., temperature, amount of direct
sunlight or shade, etc.) can greatly
impact the results of this test.
• ASTM F2170 – Standard Test
Method for Determining Relative
Humidity in Concrete Floor Slabs
Using in situ Probes. The test
includes two methods of placing
probes in a concrete slab; the first
involves drilling a hole in the concrete
slab after placement and
inserting a plastic sleeve, while the
other involves forming a hollow
sleeve in slab and placing the concrete
around it. The sleeve allows for
placement of probes that measure
relative humidity at a specific depth
within the concrete slab. The plastic
sleeves are covered and sealed to the
concrete deck throughout the entire
test to prevent any changes to the
air in the sleeve. By measuring the
relative humidity of the slab, the
user can predict the success or failure
of a coating applied to the surface
of the concrete due to excessive
moisture content.
• ASTM F2420 – Standard Test
Method for Determining Relative
Humidity on the Surface of Concrete
Floor Slab Using Relative Humidity
Probe Measurement and Insulated
Hood. Similar to ASTM F2170, this
test method measures the percentage
of relative humidity above the
surface of a concrete slab. By placing
an insulated hood that contains
humidity-measuring apparatus, the
user can predict whether the moisture
in the concrete will allow for the
placement of a coating on the surface
of the concrete. This test, however,
does not predict moisture
movement or overall moisture content
of the slab, since it measures
surface relative humidity only.
Moisture within concrete is dynamic
and can cause failures of a waterproofing
membrane under conditions
that differ from what the moisture
probe measures.
Primer Application
In addition to gauging the moisture in
the concrete substrate, manufacturers have
long used asphalt-based primers to
enhance the bond between the concrete
surface and hot fluid-applied rubberizedasphalt
membranes. These primers must
conform to ASTM D41-85 – Standard
Specification for Asphalt Primer Used in
Roofing, Damproofing, and Waterproofing,
and are applied in a thin layer over the concrete
substrate using a brush, roller, or
spray equipment. Coverage rates can vary
between 100 and 600 sq ft/gal, depending
on porosity and surface texture of the substrate
and the selected primer. When
applied too thickly, primers can experience
increased drying times or not cure by the
time the membrane is applied; when
applied too thinly, primers may not adequately
cover the substrate. Additionally,
primers can feel dry to touch but the solvent
in the primer might not have fully
flashed off. In all cases, the membrane may
experience reduced adhesion to the deck.
Applicators must also pay careful attention
to duration of exposure of the primer to
weather and construction traffic. Primers
left overnight can accumulate moisture in
the form of dew or can pick up dirt and
debris from construction traffic. In addition
to the challenges associated with application
of the primer, manufacturers have
reformulated primers to produce fewer
volatile organic compounds (VOCs) to make
them more “green” and comply with legislation.
These alternative primers have a short
track record and therefore cannot be direct-
Figure 1 – ASTM D4263 used to test the potential effects moisture in a concrete
slab may have on membrane application.
2 6 • NI C A S T R O S Y M P O S I U M O N B U I L D I N G E N V E L O P E T E C H N O L O G Y • OC T O B E R 2 0 1 1
ly correlated to adhesion failures in the
membrane. Therefore, the designer should
require careful evaluation of the primer,
preferably through mock-ups, to evaluate
the effectiveness and suitability prior to
selection and wholesale installation.
Surface Preparation
Construction of mock-ups will demonstrate
whether any concrete admixtures,
curing compounds, or concrete finishes will
affect the bond of the hot fluid-applied rubberized-
asphalt membrane to the concrete
deck. Many admixtures have no effect, but
some curing agents may prevent a strong
bond from forming between the waterproofing
membrane and the surface of the concrete.
Manufacturers require concrete substrate
to have a wood or broom finish. The
finish can also affect the bond between the
membrane and the substrate. A steel-troweled
finish or a smooth finish from formwork
can inhibit the bond, whereas a broom
or wood-float finish will enhance the bond.
A lack of bond between the waterproofing
membrane and concrete deck due to the
presence of a concrete admixture can be
easily fixed by using an etching agent or
other chemical agent on the surface of the
concrete deck. Mechanical abrasion (i.e.,
sandblasting, shotblasting, diamond grinding,
etc.) will enhance the bond in areas
with poor adhesion due to the presence of a
curing compound or smooth finish.
Construction Mock-ups
By building mock-ups, a construction
team can evaluate which combination of
products and
coverage rates
creates the best
adhesion on a
cas e -by – cas e
basis. Without determining which balance
of materials is correct for a particular application,
the result could be widespread
adhesive failure of the waterproofing membrane.
The moisture content and the condition
of the concrete deck can vary based on the
area and exposure of the project.
Constructing mock-ups at each area of
application will best predict success or failure
of the membrane and indicate whether
primer rates should vary from area to area.
A hot fluid-applied rubberized-asphalt
mock-up must meet the following criteria to
confirm adequate adhesion:
• The mock-up must produce little to
no pinholing (Figure 2). If the project
team first conducts moisture tests
on the concrete, such as those
described above, pinholing of the
mock-up will be less likely.
• The mock-up must demonstrate
cohesive failure of the waterproofing
membrane. A cohesive failure means
the membrane, when placed under
stresses great enough to cause tearing,
will debond from itself rather
than the substrate. An adhesive failure,
where the membrane tears
away from the substrate rather than
itself, is less desirable and is indicative
of a higher risk of delamination.
To perform an adhesion test, a small
area of hot fluid-applied rubberized
asphalt is placed with a reinforcing
strip of fabric or neoprene embedded
in it and a pull tab left exposed on
the end (Figure 3). The fabric or neoprene
is pulled until the membrane
fails by tearing. A cohesive failure
indicates the bond to the concrete
deck is stronger than the internal
Figure 2 – Both mock-ups
demonstrating pinholing.
The mock-up to the left is
acceptable, while the mock-up
below has excessive pinholing.
Figure 3 – The mock-up at right shows an adhesive failure
in which the hot fluid-applied rubberized asphalt pulls
completely away from the concrete substrate. The mock-up
above demonstrates a cohesive failure, which is desirable.
S Y M P O S I U M O N B U I L D I N G E N V E L O P E T E C H N O L O G Y • OC T O B E R 2 0 1 1 NI C A S T R O • 2 7
bond between layers of membrane,
while an adhesive failure indicates
insufficient bond between the membrane
and the deck. Different test
methods can measure numerical
adhesion values for comparison purposes,
but the main objective of the
test is to determine mode of failure.
CASE STUDIES
The following case studies provide
greater detail on a few projects that demonstrated
adhesion issues with the hot fluidapplied
rubberized-asphalt system.
CASE STUDY NO. 1:
CURING AGENTS
Background
A biosciences building located in
Northern California featured application of
a hot fluid-applied rubberized-asphalt
membrane on a large podium area at grade
level and multiple levels of vegetative roof
in a protected membrane configuration
(Figure 4).
Problem 1
Initial application
of the hot fluid-applied rubberized asphalt
system began at the podium level. To meet
the project schedule, the construction team
used a concrete curing agent prior to application
of the hot fluid-applied rubberizedasphalt
membrane. Despite meeting the
concrete admixture manufacturer’s curing
requirements, the initial application of
primer and membrane easily delaminated
from the surface of the concrete deck. In
response, the construction team used a
concrete surface treatment to negate the
effects of the concrete admixture. Adhesion
problems persisted.
Solution 1
The team discerned that the membrane
delaminated under certain coverage rates of
primer. The team devised a series of mockups
to determine the optimal primer coverage,
utilizing varied coverage rates and
adhesion tests. Through the mock-up
process, it became apparent a super thin
film of primer allowed the hot fluid-applied
rubberized-asphalt membrane to fully bond
to the concrete substrate.
Problem 2
During later installation of the same hot
fluid-applied rubberized-asphalt membrane
on the vegetative roof assembly, the membrane
experienced extensive pinhole failures.
Solution 2
After reviewing the installer’s primer
application procedures and determining
that they matched the successful application
at the podium deck below, it became
clear that another mechanism of failure was
causing the pinholing. Upon closer examination,
the construction team discovered
that the pinholes occurred only in the top
coat of the membrane (Figure 5). In reviewing
its application procedures, the team
realized that the installers allowed the bottom
coat and reinforcing to sit overnight.
Figure 4 – Hot fluid-applied rubberized-asphalt
application on a project in Northern California.
Figure 5 – Pinholing through the top layer
of fluid-applied rubberized asphalt.
2 8 • NI C A S T R O S Y M P O S I U M O N B U I L D I N G E N V E L O P E T E C H N O L O G Y • OC T O B E R 2 0 1 1
Upon cooling during the nighttime hours,
the reinforcement collected moisture from
the air. The moisture on the surface of the
reinforcement vaporized and drove through
the second layer of hot fluid-applied rubberized
asphalt upon its application the
next morning. The construction team concluded
that a well-timed application of the
complete waterproofing assembly is critical
to adhesion and overall performance of the
membrane. At areas of concern, the team
allowed the second layer to thoroughly dry
and then applied a third coat over the area
with extensive pinholing. For the remainder
of the project, the waterproofing contractor
installed only as much material as could be
covered with the second layer of membrane
in a single day.
CASE STUDY NO. 2:
BLISTERS IN MEMBRANE
Background
The second case study occurred during
the construction of a new hospital in
Southern California. The project included a
60,000-sq-ft vegetative roof over the operating
rooms (Figure 6). The concrete deck is a
5-in-thick, normal-weight concrete over a
vented steel deck. The concrete cured for
approximately four months prior to application
of the hot fluid-applied rubberizedasphalt
membrane. The installer reviewed
the curing compounds, form-release agents,
and substrate preparation with the hot
fluid-applied rubberized-asphalt manufacturer
prior to the start.
As outlined in the specifications, the
installer prepared a mock-up of the installation,
including all unique conditions, performed
moisture tests using the plastic
sheet method, and later performed ten
adhesions tests approximately halfway
through the installation of the hot fluidapplied
rubberized-asphalt membrane. The
project team observed good adhesion (cohesive
failure) at all adhesion tests in the field
of the roof.
Problem 1
Adhesive failure occurred between the
membrane and the concrete substrate at
the two test cuts performed at the parapets
(Figure 7).
Solution 1
After reviewing the application process
and the differences between the deck and
the parapet walls, the team attributed the
poor adhesion to surface preparation. The
parapet walls were finished smooth (not the
recommended broom or wood-trowel finish).
The team constructed a mock-up with varying
degrees of surface preparation, including
light application of surface primer, wire
wheel, and bead blasting. The wire wheel
provided the best adhesion. To remediate
the areas already completed, the contractor
removed the protection sheet, scraped off
the membrane, wire-wheeled the concrete,
and then wire-wheeled the concrete again
with a clean wheel. The contractor then
installed the reinforced hot fluid-applied
Figure 6 – A hot fluid-applied rubberized-asphalt vegetative roof in Southern
California.
Figures 7A and 7B – Adhesive failure at parapets.
S Y M P O S I U M O N B U I L D I N G E N V E L O P E T E C H N O L O G Y • OC T O B E R 2 0 1 1 NI C A S T R O • 2 9
rubberized-asphalt membrane over a
primed concrete wall.
Problem 2
Shortly after the contractor completed
installation of the second half of the roof,
the project team performed random adhesion
tests throughout the installation. At
the two areas selected, we observed large
blisters in the hot fluid-applied rubberizedasphalt
membrane. The delamination
occurred between the hot fluid-applied rubberized
asphalt and the concrete deck and
between layers of hot fluid-applied asphalt
(Figure 8A and 8B).
Solution 2
To confirm the levels of moisture in the
concrete deck, the project team performed
relative humidity tests using in situ probes.
The team drilled ten holes at random locations
in the concrete deck at varying depths
and measured the moisture content. In
each location, the moisture content was
below 76.9%, with an average of 72.7% relative
humidity. Typically, an average relative
humidity of 75% and below indicates
that moisture in the concrete deck is not
the source of failure.
The team narrowed the source of blistering
to either improper drying time of the
primer or an unknown substance on the
concrete deck (e.g., perhaps a substance
spilled on the deck during construction or
someone trekked something on their shoes
across the deck). Through additional adhesion
testing, the team identified the area of
blisters to an approximately 2,400-sq-ft
area – a much smaller area than the entire
application of membrane on the project. The
installer then removed the protection sheet,
cut open the blisters down to the concrete
deck, and patched them with the hot fluidapplied
rubberized-asphalt system (215-mil
reinforced system), extending the repair 6
inches in all directions. The waterproofing
contractor installed the protection layer set
in an additional 90-mil layer of hot fluidapplied
rubberized asphalt over the entire
area. The waterproofing contractor allowed
the primer to dry for a minimum of 24
hours on the remaining portions of the project.
Manufacturers typically require application
of the hot fluid-applied rubberized
asphalt over the primer during the same
day (within four to six hours), but the project
team learned in this instance that variance
from this rule produced a better
result. In addition, the cut-and-patch
method successfully solved the blistering
encountered during the first portion of
application.
3 0 • NI C A S T R O S Y M P O S I U M O N B U I L D I N G E N V E L O P E T E C H N O L O G Y • OC T O B E R 2 0 1 1
Figures 8A and 8B – Blistering in the
field of the roof at the top. Adhesive
failure of test openings in the field of
the roof at the bottom.
CASE STUDY NO. 3: PRIMER
APPLICATION RATE
Background
On a project in Northern California, a
20-year-old hot fluid-applied rubberizedasphalt
membrane was experiencing failures
due to a combination of root growth
and aging materials. The project consists of
multiple residences united by a large podium
deck in the center of the structure on
the third floor. The podium deck is covered
with vegetative materials over a protected
hot fluid-applied rubberized-asphalt membrane.
Problem
The owner observed leakage through
the concrete slab below the podium deck
into the parking garage below. To remediate
the leakage, the owner sought wholesale
replacement of the waterproofing membrane
above areas experiencing leakage
(Figure 9). After removal of the overburden
and existing waterproofing, the construction
team prepared several mock-ups with
varying primer coverage rates to determine
the amount that would yield the best adhesion
to the concrete deck. Surprisingly,
even the old concrete deck, which after 20
years should demonstrate a moisture content
at equilibrium, yielded a variety of
results dependent on the coverage of
primer.
Solution
The construction team selected a primer
coverage rate associated with the mock-up
that had the best adhesion and successfully
used the hot fluid-applied rubberized
asphalt to the repair areas (Figure 10). The
team learned from these mock-ups, though,
that moisture content alone does not dictate
the success or failure of the waterproofing
assembly. Optimal primer coverage
rates vary on a project-by-project basis, and
performing mock-ups to determine the
amount of primer is critical to successful
application.
These case studies demonstrate that
failures of hot fluid-applied rubberized
asphalt applied to concrete can be overcome
with forethought and diligence. On
each project, the team recognized the need
for adjustments to the application process
and utilized quality control methods to create
a successful application.
RECOMMENDATIONS
Several tools are available to prevent the
failure of hot-applied rubberized asphalt to
concrete decks. Each tool will help the user
better understand the characteristics of
deck adhesion on a project-by-project
basis. Successful application will involve
the following:
• Allowing the concrete substrate adequate
time to cure
• Measuring the relative humidity of
the deck using one of the available
ASTM test methods
• Properly cleaning the deck, including
surface treatment if concrete
additives are present and mechanical
abrasion to remove curing compounds
and provide the desired sur-
Figure 9 – Wholesale replacement of an existing hot fluid-applied rubberizedasphalt
membrane still required attention to concrete moisture content and
primer application rates.
Figure 10 – The team used mock-ups to find the best primer application rates to
cause adhesion of the membrane.
S Y M P O S I U M O N B U I L D I N G E N V E L O P E T E C H N O L O G Y • OC T O B E R 2 0 1 1 NI C A S T R O • 3 1
face texture
• Constructing several mock-ups at
each area of hot fluid-applied rubberized
asphalt application to establish
the appropriate amount of
primer application, required drying
time, and surface preparation.
To prevent future failures, the most reliable
approach is to incorporate the recommendations
outlined above into the specification.
Specifications should include the
following: requirements to perform a specific
number of relative humidity tests on the
concrete substrate prior to application of
the membrane, quantification of the acceptable
moisture content of the concrete substrate,
inclusion of surface treatment for
concrete additives and mechanical abrasion
to remove curing compounds, and construction
of several mock-ups. During construction,
mock-up testing and enhanced
quality control procedures will provide the
best chance for a successful application of
hot fluid-applied rubberized-asphalt membranes.
3 2 • NI C A S T R O S Y M P O S I U M O N B U I L D I N G E N V E L O P E T E C H N O L O G Y • OC T O B E R 2 0 1 1