Starting Over: Reskinning Deteriorated Masonry Walls in Occupied Condominium Towers

November 16, 2015

Starting Over: Resk inning Deteriorated
Masonry Walls in Occ upied
Condominium Towers
Reid Johnson, PEng, and Sara h Gra y, PEng, CAHP
WSP Halsall
2300 Yonge Street, Suite 2300, Toronto, Ontario, Canada M4P1E4
Phone: 416-487-5256 • Fax: 416-487-9766 • E-mail: rjohnson@halsall.com and sgray@halsall.com
S y m p o s i u m o n B u i l d i n g E n v e l o p e T e c h n o l o g y • No v e m be r 2 0 1 5 J o h n s o n a n d Gr a y • 2 1
ABSTRACT
This presentation focuses on an innovative approach for cladding replacement (reskinning)
of two 30-story towers. This will interest those who evaluate and repair older buildings.
The original wall system had issues with water leakage through the cladding, brick masonry
deterioration, and severe corrosion of the steel shelf angles. Localized repairs were previously
completed to address one-off problems instead of the systemic issues with the wall construction.
This time around, the condo decided to start over and proceed with a cladding replacement.
We will walk through the multiple benefits of this approach, as well as the challenges.
SPEAKERS
Reid Johnson, PE ng — WSP Halsall
Rei d Joh nso n is a project manager with WSP Halsall, a consulting engineering firm
with offices across Canada and in Washington, D.C. He specializes in the repair of concrete
structures, such as parking garages and balconies, as well as building envelope elements,
including metal cladding, masonry cladding, roofs, and windows. He is also the practice
coordinator of concrete repairs and asphaltic concrete and waterproofing for the company.
Sarah Gray, PE ng , CAHP — WSP Halsall
Sarah Gray is a project principal and the restoration practice leader at WSP Halsall,
a multidiscipline engineering and consulting firm based in Toronto, Canada. Sarah’s expertise
includes the evaluation and repair of existing cladding assemblies, particularly thick
masonry, thin veneer masonry, and curtain wall systems. She has written and presented
on building envelope topics in both Canada and the U.S., including for the Ontario Building
Envelope Council and RCI. Sarah is licensed as a professional engineer in Ontario.
2 2 • J o h n s o n a n d Gr a y S y m p o s i u m o n B u i l d i n g E n v e l o p e T e c h n o l o g y • No v e m be r 2 0 1 5
Starting Over: Resk inning Deteriorated
Masonry Walls in Occ upied
Condominium Towers
INTRODUCTION
What happens when a condominium
complex has deteriorated brick masonry
walls, corroding shelf angles, leakage
issues, and limited funds to make the needed
repairs? This case study focuses on an
innovative approach for cladding replacement
(reskinning) to address multiple problems
at two 30-story towers in Toronto.
THE CONDOMINIUM COMPLEX
The Crescent Town condominium complex
in the east part of Toronto (approximately
20 minutes from downtown) was
constructed in the late 1960s and was completed
in 1972. There are three high-rise
towers and three townhouse blocks with
1,420 units combined, making it the largest
condominium complex in Canada (as one
corporation). See Figure 1 and Photo 1.
The buildings have conventional concrete
structural framing. The wall cladding
from inside to outside is plaster on 4-in.-
thick concrete block backup wall, 2-in.
expanded polystyrene insulation, ½-in. air
gap, and 3½-in.-thick clay brick veneer.
The brick veneer is supported by shopprimed
steel shelf angles that are secured to
the floor slabs, and galvanized steel ladder
ties provide lateral restraint. No flashings
were present at the window heads.
WSP Halsall (formerly operated as Halsall
Associates) has been involved at this complex
since 1994. During the 1990s, the
condo implemented extensive garage repairs
and localized wall repairs to address leakage.
HISTORICAL ISSUES
Leakage through the walls and windows
had been a problem since original construction.
In 1989, the top 10 stories of each
tower’s east elevation were overclad with
prefinished “corrugated” steel cladding hung
from 3-in.-deep horizontal Z-girts secured to
the original brick veneer. The overcladding
included an air/vapor/moisture control layer
(peel-and-stick membrane) over the brick
masonry, and 3-in.-thick extruded polystyrene
insulation was sandwiched between
the original brick and new metal cladding.
The metal cladding
system reduced the
leakage issues and
improved thermal performance
at these elevations.
Elsewhere on
the buildings, targeted
repairs such as mortar
repointing, through-wall flashing installation
at the shelf angles and window heads, localized
brick replacement, and sealant replacement
were completed to manage ongoing
reported leakage. At the end of 2012, WSP
was asked to evaluate the north elevations
because they had been experiencing the
most leakage to date. At the time of the
evaluation, there were over 20 condo units
with active leaks.
UP-CLOSE VISUAL EVALUATION
AND DESTRUCTIVE TESTING
Our 2012 evaluation was limited to the
north elevation of 1 and 5 Massey Square
(see Figure 1). To complete the evaluation
we coordinated with a contractor specializing
in wall repairs to provide swing stage
access and complete test openings through
the brick. We began by completing a visual
review and found:
S y m p o s i u m o n B u i l d i n g E n v e l o p e T e c h n o l o g y • No v e m be r 2 0 1 5 J o h n s o n a n d Gr a y • 2 3
Photo 1 – Overview from north of the two high-rise
buildings. The 2013/2014 phase of reskinning is
shown in progress at 5 Massey Square on the left
and 1 Massey Square on the far right.
Figure 1 – Site plan showing the Crescent Town
property and the work areas discussed in this article.
• Significant brick masonry and mortar
deterioration—particularly at the
top half of the building and below
windows
• Failure of existing building sealants
• Evidence of shelf angle corrosion
Our visual observations informed us
where to make the test openings. The test
openings revealed the following conditions.
Shelf Angle Corrosion
We found that 50% of shelf angles on 5
Massey and 70% of shelf angles at 1 Massey
had “rust jacking.” “Jacking” occurs when
the steel shelf angle corrodes to the point
that the horizontal leg of the angle lifts the
brick masonry. (Corrosion products occupy
up to ten times the area as the original
steel.) We also found that the mortar at these
locations had failed (see Photo 2). In many
cases the mortar joints were cracked and
debonded, leaving some mortar loose and at
risk of falling. During the review, we removed
hundreds of feet of mortar by hand.
We found horizontal cracking of the
mortar joints between the shelf angle and
the first set of masonry ties. In some locations,
the wall was angled outwards, likely to
accommodate the rust jacking (see Photo 3).
Ideally, two-thirds of the brick depth
(thickness) would bear on the shelf angle to
provide adequate support to the masonry
panel above. At our test openings and at the
heads of the windows, we found that less
than half of the brick depth was supported
by the shelf angle due to short/underdesigned
horizontal legs. We checked the
condition of the lateral securement ties at
different locations over the height of the wall
panels. Luckily, the galvanized steel ladder
ties we exposed were in relatively good
condition and provided enough restraint to
prevent the brick panels from toppling over.
Additionally, in the late 1990s, a 1-in. steel
extension was welded to the toe of some
shelf angles to provide more support (the
red dashed line on Photo 3 shows the weld
location).
Efflorescence
We found a significant amount of efflorescence
on the masonry panels at the top
of the buildings and below the windows
(see Photo 4). This indicates that a significant
amount of moisture had been present,
bringing the natural salts in the masonry
to the surface as the moisture dried (we did
not test whether the salts were derived from
the brick and/or mortar).
Masonry Deterioration
The mortar joints near the top of the
buildings were cracked and/or eroded. The
high winds at these buildings likely promoted
2 4 • J o h n s o n a n d Gr a y S y m p o s i u m o n B u i l d i n g E n v e l o p e T e c h n o l o g y • No v e m be r 2 0 1 5
Photo 2 – Example of rust jacking and
mortar loss at shelf angles.
Photo 3 – Brick masonry was
angled out above the shelf
angles due to corrosion jacking.
water ingress into the masonry through
these deficiencies.
There was significant brick deterioration,
including freeze/thaw deterioration,
at the corners of the walls and below the
windows (see Photo 5). The windowsill flashings
had very small drip edges, and the
underside of the drip edges was filled with
sealant (“over-caulked”) such that there
was no effective drip edge. Due to surface
tension of water, water was shedding from
the sill directly onto the wall below, further
saturating the masonry.
Safety Issues
There were several locations, particularly
at outside corners, where the mortar
was severely deteriorated or entirely missing.
Some of the bricks at these locations
could be removed by hand, therefore posing
a major safety risk if they were to fall.
During our evaluation we had the contractor
remove and replace these bricks.
Our test openings were completed at
several locations on the buildings to confirm
our findings in the visual review and verify
the backup wall conditions. Our openings
confirmed that most of the shelf angles were
actively corroding. At some of our openings,
the structural integrity of the shelf angles
was compromised due to
severe corrosion. At these
locations, we advised the
client to have the contractor
repair the shelf angles
immediately, which they
did (see Photo 6).
Since we found several
safety issues in a
relatively small sample
of openings, we recommended
fencing off the at-grade areas below
the walls until further repairs could be completed.
The client agreed and had fencing
installed to restrict access.
Other Original Wall Conditions
We found 2-in.-thick original expanded
polystyrene insulation between the brick
and the backup wall, but the insulation
was not continuous over the slab edges. The
backup wall was typical of the era: There
were many open joints (missing mortar)
between the blocks, and a hodgepodge of
brick and block at the underside of the floor
slab to make up the floor-to-floor height.
There were weep holes above and below the
shelf angles, but the original wall did not
have an air/vapor/moisture control layer.
However, there was a strip of black polyethylene
(similar to a garbage bag) that was
S y m p o s i u m o n B u i l d i n g E n v e l o p e T e c h n o l o g y • No v e m be r 2 0 1 5 J o h n s o n a n d Gr a y • 2 5
Photo 4 – Efflorescence on the north elevation of 1 Massey Square.
This was typical on the upper floors.
Photo 6 – Typical
condition of the shelf
angles at the test
openings.
Photo 5 – Typical brick and mortar
deterioration below the windowsill flashings.
friction-fit behind the insulation and draped
over the slab edge onto the vertical leg of
the shelf angle. The polyethylene was likely
meant to be a flashing to promote drainage
out of the wall, but it was not continuous
or was missing/damaged in some of our
openings.
Weather Conditions and Geography
Many wind-driven rain events in Toronto
soak the north and east elevations of buildings.
There is also no direct sunlight on
the north elevation, so the north walls take
much longer to dry between rain events.
There is a ravine and parkland north of
Crescent Town, and a golf course at the east
side. This leaves the high-rises completely
exposed to high winds, which increases risk
of water entry into wall defects.
Evaluation Summary
A good wall assembly separates the
interior space from the exterior. Based on
our evaluation findings, it was clear that the
original cladding assembly was unsuccessful
as it allowed significant leakage into the
building. There was a very narrow cavity
between the insulation and the brick, which
the mortar bridged in some locations, allowing
moisture to move into the wall and preventing
water from draining to the weep holes
at the shelf angle. The attempted throughwall
flashing was not effectively directing
the water out of the wall, and water that
bypassed the brick veneer leaked into the
suites through voids in the backup wall.
In short, the wall needed to receive a
renewed outer watershedding layer through
repair of the brick or provision of a new
“skin.” Otherwise, the wall needed an improved
cavity drainage system (i.e., effective
through-wall flashings) to manage water
that leaked through the masonry. The
corroded shelf angles also needed to be
replaced if a brick repair strategy was to be
implemented.
REPAIR OPTIONS
There are many possible repair solutions
for under-performing masonry wall assemblies.
WSP’s approach is to present its clients
with options of varying cost, durability/
performance, schedule/duration, and
facility impact. We typically present these
options in the context of being gold-, silver-,
or bronze-level repair strategies, with
bronze being the lowest-cost/lowest-impact
solution (and potentially highest risk for
future leakage or other problems) and gold
having the highest cost/highest impact (and
lowest risk for future issues). The cladding
repair options we presented to the Crescent
Town condominium board are shown below.
Bronze (about $85/sq. ft. before taxes,
in Canadian dollars)
The most economical approach to repair
the masonry deterioration and steel corrosion
would include:
• Replacing the corroded shelf angles
• Installing through-wall flashings at
leakage locations and where shelf
angles are replaced
• Repointing all deteriorated mortar
joints
• Replacing all building sealant,
including window perimeters
• Applying a masonry sealer to reduce
the amount of water absorbed into
the brick masonry
This was presented as a “targeted repair”
strategy that maintained and renewed
the existing cladding assembly. Window
replacement was not included in this strategy.
Due to the height of the building and
the repair quantities required, the bronzelevel
repair was still quite expensive when
applied to the north elevations.
With this solution, we warned the client
that this would not be a fix-all solution; over
time, local repairs would be required due to
new/ongoing leaks, further masonry deterioration,
and continued corrosion of the
original remaining shelf angles.
Silver (about $125/sq. ft.)
The client was quite satisfied with the
performance and appearance of the overcladding
strategy completed in 1989, so we
presented an option to overclad the existing
brick on the north elevations of 1 and
5 Massey Square. A portion of the existing
metal cladding returned onto one of the
drops reviewed during our 2012 evaluation,
and we found the newer cladding was still
performing very well.
Although the brick, mortar, flashing,
2 6 • J o h n s o n a n d Gr a y S y m p o s i u m o n B u i l d i n g E n v e l o p e T e c h n o l o g y • No v e m be r 2 0 1 5
Figure 2 – Typical wall section of the reskinning assembly.
and sealant repairs did not have to be
included in the overcladding option, it would
still be important to have a structurally
sound wall for securing the cladding.
Therefore, the shelf angles and deteriorated
bricks would still need to be replaced with
this strategy. The overcladding option was
about 45% more expensive than the bronze
strategy.
Gold (about $165/sq. ft.)
Since the costs were so significant for
the first two options, we went one step further
and provided an option to remove the
existing masonry and install a new exterior
cladding assembly (reskinning). The new
cladding would include:
• N ew windows
• An air/vapor/moisture control layer
(membrane) applied to the backup
block wall
• Eight inches of semi-rigid mineral
wool insulation (important in a cold
climate)
• A continuous water-resistive barrier
over the insulation
• Prefinished “corrugated” steel paneling
to match the existing overcladding
This strategy was about 95% more
expensive than the bronze strategy and 30%
more expensive than the silver option. The
gold strategy clearly had a higher upfront
cost, but this strategy would most effectively
mitigate leakage risk over the long term. The
significant advantage to this option would
be reduced exterior maintenance; other
than sealant replacement after 15 to 20
years of service, the next general renewal
could be deferred by more than 50 years
due to the expected performance and durability
of the steel cladding.
SELECTED REPAIR STRATEGY:
RESKINNING
We were surprised but also impressed
that the condo’s board of directors, with
their property manager’s input, decided
to implement the “gold-level” reskinning
and window replacement option at the
north elevations of 1 and 5 Massey Square.
Their main driver for choosing the higher
initial cost option was achieving reduced
long-term maintenance costs. Better performance
(particularly reduced water leaks)
would also mean better resale value for the
condo unit owners.
Cladding Selection
There are many cladding options, so
why corrugated metal cladding? The board’s
preference was to match the previous overcladding
on adjacent elevations. The site
plan illustrates that the reskinning would
be applied to a small portion of the overall
building. The reskinning may not be
implemented on other wall areas (beyond
the north elevations) if it is not deemed
necessary, based on leakage reports or findings
during future wall evaluations. Even if
the board decides to continue the reskinning
strategy at all remaining wall areas,
we expect that the work would be phased
over approximately 15 years, based on the
S y m p o s i u m o n B u i l d i n g E n v e l o p e T e c h n o l o g y • No v e m be r 2 0 1 5 J o h n s o n a n d Gr a y • 2 7
Photo 7 – Primary vertical z-girts installed over the new
air/vapor/moisture control layer (membrane) applied to the
existing backup wall.
Photo 8 – Secondary horizontal z-girts to support the
cladding panels.
condo’s available funding. The decision to
match the aesthetics of the previous overcladding
allows the local new reskinning to
blend in.
Cladding Design
Reskinning requires significant design
work in order to be successful. We designed
a custom detail for every wall connection
and interface. We went back to the basics
and used drafting paper, a scale, and a
pencil to draw the wall assembly that would
remain after stripping off the existing brick
and insulation layers (Figure 2). We used
our test opening measurements to come up
with our “blank canvas” to build from. Next
we calculated the sizing of z-girts required
to support the cladding and resist wind
loads. After that, there were many design
iterations to determine how to tie everything
together to be watertight, thermally
efficient, and durable.
Although all the design work sounds
tedious, in many ways, reskinning simplified
the repair strategy. We no longer had to
worry about the original brick, shelf angles,
and sealants, as they were all going to be
removed. We did not need to estimate localized
repair quantities for pricing; this simplified
the bidding process, as most repairs
were lump sum amounts.
The design includes 6-in.-deep vertical
z-girts that span from floor slab to floor slab
as the main support for the new cladding
(see Photo 7). In order to install the corrugated
metal cladding with the ribs running
vertically, secondary horizontal z-girts were
installed over the primary vertical girts (see
Photo 8). This arrangement also reduces
thermal bridging, as there is insulation
between the primary vertical girts and also
between the secondary horizontal z-girts
(two layers of insulation).
The insulation layer was covered with
a water-resistive barrier to reduce wind
washing and air movement through the
insulation and to improve watershedding.
The corrugated steel cladding was secured
to the secondary horizontal girts.
Corrosion Protection
There is a lot of steel in the new
wall assembly, so how did we protect it
from corrosion? Our design included using
Galvalume (AZ50) on all steel z-girts and
cladding panels. Galvalume is a hot-dipped
coating comprised of 55% aluminum and
45% zinc. Based on industry testing, it
provides a higher corrosion resistance than
other galvanizing products. All of the fasteners
and girt anchors are stainless steel. The
corrugated steel cladding is Galvalume with
a high-quality, factory-applied, siliconemodified
polyester paint. This coating is
designed for 40-year paint film integrity, but
with the northern exposure, will likely last
longer. We specified Galvalume as the base
material with other galvanizing materials as
optional items. The pricing between the different
materials was very close, and for the
additional protection, we recommended that
the client choose the slightly more expensive
and better-performing Galvalume.
Window Replacement
The original windows at the north walls
were located at inside corners of the building
plan (Figure 3). If we left the original
windows in place, the additional thickness
of the new cladding assembly would block a
few inches of the window on one side. The
existing windows were 40 years old, singleglazed,
leaky, and in need of replacement,
so we included new windows that were
slightly narrower than the original windows
at these corners. A steel stud box installed
at the same time as the new windows gave
the extra width necessary to support the
deeper exterior cladding at the corner. The
new windows have aluminum, thermally
2 8 • J o h n s o n a n d Gr a y S y m p o s i u m o n B u i l d i n g E n v e l o p e T e c h n o l o g y • No v e m be r 2 0 1 5
Figure 3 – Detail plan view of window detail at re-entrant corner.
broken frames with fixed insulating glass
units (IGUs) above a double layer of singlepane
sliders.
We designed the cladding to last for
at least 50 years, and we anticipate that
the new windows may have to be replaced
before the cladding. To make future window
replacement easier and cause minimal damage
to the cladding, the new windows were
installed independently from the cladding,
using metal angles attached to the existing
building structure (Figure 3). The vertical
leg of the angles also provided a termination
surface for the membrane flashings around
the window perimeter.
Access Considerations
We took lessons learned from our initial
condition evaluation and applied them to
the reskinning project requirements. The
evaluation used swing-stage access, and
we had a lot of difficulty and shutdowns
because high winds were beyond the safety
limits of the swing stage. Even when the
winds allowed use of the stage, the stage
was not stable enough to allow for efficient
work, which could have led to significant
delays during the reskinning project. We
would not normally direct bidders on the
type of access equipment to use on a project,
but we made an exception for Crescent
Town. Due to the site’s high winds and high
loads from brick removal/conveyance, we
specified the use of a mast climber for the
cladding project.
Construction Impacts
The towers are occupied residential
buildings, and our repair strategy needed
to take that into account. To keep water out
of the units, we specified for the air/vapor/
moisture control layer (membrane) to be
installed the same day that the brick was removed.
Due to the slenderness of the backup
wall during removals, temporary shoring
of the wall on the exterior was necessary.
EXECUTION
The project scope was tendered to prequalified
Toronto-area restoration contractors
and the client awarded the work. Due
to the level of detail for this repair, the
beginning of the project required a lot of
lead time for reviewing shop drawings (with
multiple revisions due to the complexity)
and building mock-ups of the cladding and
window installation before general work
could begin.
The window
mock-up was very
important because
it uncovered a few
inconsistencies in
the original construction
and previous
repairs. We
expected that the
concrete block backup
would be continuous
from the floor
slab to the underside
of the windowsill;
in fact, we
found 2 in. of mortar
and a course of
clay brick below the
original marble sill.
The mortar was not
sound and needed
to be removed, but
the clay brick was
not structurally adequate
to receive the
new window securement
(because of
the size of the brick
cells). As we brainstormed
solutions,
we listened to ideas
from everyone. The
property manager
who was with us
during the mock-up
suggested installing
an aluminum tube
under the window to
receive the window
anchors. The entire
project team liked
that idea because it also allowed for the
vertical dimension of the window opening to
be standardized. (The height of the existing
window openings varied from suite to suite,
but with the aluminum tube, a slightly
smaller window could be installed and the
tube used as the height adjustment.)
Another window installation issue was
that false walls were previously installed
in many units to manage leakage without
actually repairing the exterior walls. In
order to properly install the windows, this
meant that a lot more drywall and plasterwork
were required beyond what was
expected in the design phase. This unforeseen
condition did not affect the cladding or
window design, but added time and cost to
the project and disruption to the residents.
We also found that each unit had electrical
conduits that ran floor-to-ceiling to a
wall-mounted interior outlet. The original
builder broke open the exterior side of the
concrete block cells in the backup wall to
run the conduit. Based on the corrosion of
the conduits and interior plaster damage,
the cell openings were a leakage path into
the suites. We could have filled the cells
with mortar, but the cure time would have
delayed installation of the membrane. This
would not only slow down production, but
also leave a portion of the wall unprotected
if it rained or snowed. Instead, we installed
sheet metal pin-bolted to the two sides of
the opening; this provided a sound sub-
S y m p o s i u m o n B u i l d i n g E n v e l o p e T e c h n o l o g y • No v e m be r 2 0 1 5 J o h n s o n a n d Gr a y • 2 9
Photo 9 – Reskinning in progress.
strate to adhere the continuous membrane
across the void.
There will always be minor issues with
every project, and this project was no exception.
However, the extra time we spent
during the planning, design, and mock-up
phases was a good investment and led to a
fairly trouble-free construction process.
While as consultants we were focused
on design and engineering, there was a lot
of coordination and effort on the part of the
property management and the contractor
to make this project a success. The project
got off to a slow start, but as the contractor
refined construction sequencing and coordination
of its forces and subtrades, work
progressed more quickly. Property management
and the board provided quick answers
when needed to avoid delays in construction
and helped to coordinate interior access for
the window installation.
The important thing is to not make the
same mistakes again, so we applied the lessons
learned from the Phase 1 reskinning
work into the specifications for the subsequent
phases of the multiyear project.
VALIDATION
Our test openings during the evaluation
exposed only a small percentage of the total
wall area. To determine if the extrapolation
of our evaluation findings was correct
(i.e., that the shelf angles were typically
significantly corroded), we had the contractor
mark the floor number on the original
shelf angles before removing them, and
then they stored the original angles for our
review. We found that our evaluation estimates
were similar to the actual shelf angle
deterioration, but also found areas of severe
steel corrosion next to areas with no corrosion
(Photo 10). This could mean that some
severe corrosion areas could have been
missed if a localized shelf angle replacement
repair strategy had been implemented (such
as the bronze-level repair proposed), leaving
the client with risk for future significant
repairs. Our findings supported our initial
recommendation and the client’s choice to
proceed with the reskinning solution.
CLOSING
Reskinning was an innovative solution
to address multiple issues identified with
the existing exterior masonry wall assembly.
Reskinning may not be the right solution
for every building type or client, but in
this case, it met the client’s objectives for
a long-term, lower-maintenance solution.
The added moisture resistance and knowing
that the structural safety concerns have
been removed outweighed the added costs.
Although this project’s primary purpose was
not to improve the energy efficiency of the
building, the added insulation and airtightness
provide energy savings and improved
resident comfort.
To date, the reskinning project has been
completed only on a small portion of the
building to address immediate public safety
concerns and leakage. Further phases of
reskinning will be completed based on further
evaluation and determination of priority
areas.
ACKNOWLEDGEMENTS
Property Management at Crescent Town
and the Crescent Town Board of Directors
Maxim Group General Contracting,
reskinning contractor from 2013-2015
Novoclad Systems Inc., metal cladding
subcontractor for the reskinning
3 0 • J o h n s o n a n d Gr a y S y m p o s i u m o n B u i l d i n g E n v e l o p e T e c h n o l o g y • No v e m be r 2 0 1 5
Photo 10 – Shelf angles with areas of severe corrosion adjacent to areas with little
surface corrosion.